Wallets&Exchanges

Now Live: Changes to Minimum Price Increments, Lot Size, Base Initial Margin and Maintenance Margin

Minimum Price Increments

The Minimum Price Increments for the following contracts were reduced as shown below on 21 Nov 2024 at 04:00 UTC.

Perpetual swap 

Current Minimum Price Increment (USD)

Minimum Price Increment (USD) starting
21 Nov 2024 04:00:00 UTC

APEUSDT

0.001

0.0001

NOTUSDT

0.00001

0.000001

BANANAUSDT

0.01

0.0001

NEIROUSDT

0.00001

0.000001

GMEUSDT

0.00001

0.000001

BIGTIMEUSDT

0.0001

0.00001

The Minimum Price Increment (Tick Size) is the smallest increment by which the price of a contract can move. 

A smaller Minimum Price Increment can theoretically lead to reduced bid-offer spreads, useful for price takers when crossing the spread to trade.

Lot Size

The Lot Sizes for the following contracts were reduced as shown below on 21 Nov 2024 at 04:00 UTC.

Perpetual swap 

Current Lot Size (Contracts)

Lot Size (Contracts) starting
21 Nov 2024 04:00:00 UTC

EIGENUSDT

10

1

PYTHUSDT

100

10

WIFUSDT

10

1


The Lot Size is an instrument’s minimum trading unit (as number of contracts).

A smaller Lot Size means that traders can place orders with a smaller position size increment and participate in trading these contracts with smaller capital requirements.

Base Initial Margin and Maintenance Margin (Leverage)

The Base Initial Margin, Maintenance Margin requirements and Base Risk Limits and Risk Step for the following contracts were changed as shown below on 21 Nov 2024 at 04:00 UTC.

These changes will apply to new positions, new orders and any leverage or Risk Limit changes, applied to existing positions or existing orders. The current Margin requirements for our products can be found here

Perpetual swap 

Base Maintenance Margin starting
21 Nov 2024 04:00:00 UTC

Base Initial Margin starting
21 Nov 2024 04:00:00 UTC

Base Risk Limit and Risk Step starting 21 Nov 2024 04:00:00 UTC

POLUSDT, TIAUSDT

1.5%

3%

1,000,000 USDT

Impact of changes to Base Initial Margin and Maintenance Margin under all Risk Limits (for the above contracts):

  • Initial Margin requirements will decrease, so Bankruptcy Price will move closer to Average Entry Price and Maximum Leverage available will increase.
  • Maintenance Margin requirements will decrease, so Liquidation Price will move closer to Bankruptcy Price and the amount of Maintenance Margin lost in the event of liquidation, will decrease.
  • The difference between Initial Margin and Maintenance Margin will decrease, so Liquidation Price will move closer to Average Entry Price.

In the meantime, if you have any questions please contact Support.

The post Now Live: Changes to Minimum Price Increments, Lot Size, Base Initial Margin and Maintenance Margin appeared first on BitMEX Blog.

​BitMEX Blog 

Read More 

Schreibe einen Kommentar

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Please enter CoinGecko Free Api Key to get this plugin works.